Sunday 16 May 2010

Module 4.0 - Mini Project

1. Print out your questionnaire designed in 4.0 EOU assignment, to distribute it to your audience (Sample size : 15 – 25).
2. Collect data.
3. Prepare a structure in Excel along with validation check.
4. Enter data collected.
5. Check the data is plausible, make the necessary corrections.
6. Read the data tio check the trend
7. Show your conclusion (result) through presentation.

Should be completed by Friday, 28th May 2010

CW Module 5.0 Case Study

Read the case study and answer the questions in the case study and upload it to your blog.

Thursday 6 May 2010

HW Blog update - Hypothesis

You need to upload your hypothesis and steps to reach that hypothesis to your blogs.
You also need to comment on two of your classmates hypothesis.
Please make sure you complete this work by tuesday, 11/05/2010.

Wednesday 5 May 2010

EOU Assignment and Class test for Module 4

The End of the Unit assignment will be held on Friday 07 May 2010 and
Class test for Module 4 ICT will be held on 11 May 2010.
You need to prepare from your ICT text book Units 4 - 4.6

Best of Luck.

Monday 26 April 2010

Monday 19 April 2010

Homework - due on Monday April 26 2010.

Please upload your CW 4.3 Validations and 4.4 searching techniques to the blog by Monday April 26 2010.

Home work 4.4 Sorting and Searching Worksheet is due on Monday 26/04/2010

Tuesday 2 March 2010

Class Test on Module 3 - Friday, 5th March

End of the module assignment on Tuesday, 2nd March
Class test for Module 3 will be held on Friday 5th March 2010